WHAT HAVE BEEN ACCOMPLISHED:

This project included 2.2 miles of freeway improvement along SR4 for the Measure C program.   It included a bridge replacement over BNSF Railway, Undercrossing structure, retaining walls and MSE walls.

JMEC performed Independent Check of PS&E (plans, specifications and estimates) for the 4-span Christie Overhead with 290-ft (88.5m) maximum span.  The bridge is of CIP Prestressed Concrete Box Girder constructed over BNSF Railway.

The use of long span across railroad is required to satisfy railroad and PUC  requirements.
Project Role:  Subconsultant for Bridge Design

Clients:  California Department of Transportation
               Parsons

Schedule:  Construction was completed in 2001